Items where Division is "Fakultas Teknik > Program Studi Teknik Sipil" and Year is 2024

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | B | D | I | J | L | M | N | P | S | U | W | Z
Number of items: 21.

A

Adzim, M. Fatkhul (2024) Analisis Produktivitas Tenaga Kerja pada Pekerjaan Struktur Lantai 3 dan Lantai 4 Proyek Gedung Medik Tahap 3 RS Siti Khodijah Muhammadiyah Sepanjang-Sidoarjo. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Ar Rasyied, Syahrur Rahman (2024) Analisis Simpang Empat Bersinyal Metode Pedoman Kapasitas Jalan Indonesia (PKJI 2014) di Persimpangan Gedangan Kabupaten Sidoarjo. (Analysis Of Four Singnaled Intersections Method Indonesian Road Capacity Guidelines (PKJI 2014) At The Inttersection Of Gedangan District Sidoarjo). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Atmaja, Carlos Alexandro Putra (2024) Analisis Faktor Keterlambatan Proyek Pembangunan Jalan Lingkar Selatan Kabupaten Sampang Dengan Metode Fault Tree Analysis. (Analysis Of Delay Factor in South Ring Road Construction Project in Sampang District Using Fault Tree Analysisis Method). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

B

Batilmurik, Fredrik (2024) Analisi Kondisi Kerusakan Jalan pada Lapisan Permukaan Jalan Raya Abdul Rahman Wahid Langgur Kabuoaten Maluku Tenggara Dengan Menggunakan Metode Pavment Condition Index. (Analysis Of Road Damage Conditions On The Survace Layer Of The Abdul Rahman Wahid Langgur Highway,Southeast Maluku District Using The Pavement Condition Indeks). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

D

Dana, Ari Widia (2024) Analisis Kebutuhan Fasilitas Bagi Penyandang Disabilitas Fisik pada Transportasi Publik Stasiun Kereta Api di Kabupaten Lamongan. (Analysis Of Facility Needs for People With Physical Disabilities On Public Transportation Train Station in Lamongan District). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

I

Ihza, Ahmad Yusril (2024) Analisis Efisiensi Volume Material Menggunakan Software Bim Cubicost Take Off Rebar dan Take Off Architecture Pada Studi Kasus Proyek Pembangunan Gedung Fakultas Iimu Sosial dan Ilmu Politik Kampus II Uin Sunan Ampel Surabaya. (Material Volume Efficiency Analysis Using Bim Software Cubicost Take Off Rebar and Take Off Architecture In A Case Study of Building Constructions Projects Fakulty Of Social and Politicall Sciense Campus II UIN Sunan Ampel Surabaya). Undergraduate thesis, Universitas 17 Agustus 1945.

J

Jamila, Rika (2024) Evaluasi Penerapan K3 pada Proyek Pembangunan Jalur Ganda Jalan Kereta Api Lintas Selatan Jawa Mojokerto –Sepanjang (Paket 9). (Evaluation of OHS Implementation in The Construction Project of Double-Track Railway Line in Southern Cross Java, Mojokerto-Sepanjang (Package 9)). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

L

Liespono, Agnes (2024) Analisis Produktivitas Tenaga Kerja dengan Metode Work Sampling pada Proyek Pembangunan Perumahan Pakuwon City Surabaya. (Analysis Of Labor Productivity By work Sampling Method in Pakuwon City Housing Development Project Surabaya). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

M

Mahendra, Muhammad Yusuf (2024) Analisis Biaya dan Waktu Menggunakan Crashing Method pada Proyek Peningkatan Jalan Banyakan-Tiron Kediri. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Mahendra, Prayuda Ihza (2024) Analisis Perhitungan Biaya dan Waktu Pekerjaan Redesign Pondasi pada Tower 2 Institut Teknologi Sepuluh Nopember Surabaya Dengan Metode Crashing. (Cost and Time Calculation Analysis of Foundation Redesign Work on Tower 2 of Institut Teknologi Sepuluh Nopember Surabaya Using the Crashing Method). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

N

Nadlif, Dimas Amrun (2024) Analisis Volume Kebutuhan Material Baja Proyek Pembangunan Gudang Pabrik PT Citiplumb Kota Lamongan Menggunakan Software Revit. (Analysis of The Volume of Steel Material Requirements for The PT Citiplumb Factory Warehouse Construction Project in Lamongan City Using Revit Software). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Nugroho, Santoso (2024) Pengaruh Penggunaan Abu Serabut Kelapa (ASK) Sebagai Bahan Tambah Terhadap Kuat Tekan Beton Alir. (The Effect Of Using Coconut Fiber ASH (ASK) As An Added Material On The Compressive Sterength Of Flow Concrete). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Nurabidin, Muhammad Rafli (2024) Analisis Percepatan Terhadap Biaya dan Waktu Menggunakan Metode Time Cost Trade Off (Studi Kasus Pembangunan Gedung Workshop Teknik Mesin UPN Veteran Jawa Timur). (Acceleration Analysis of Costs and Time Using the Time Cost Trade Off Method (Case Study of the Construction of the UPN Veteran Mechanical Engineering Workshop Building, East Java)). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

P

Pamungkas, Sigit (2024) Analisis Kondisi Tempat Parkir di Sekolah Alam Insan Mulia Surabaya. (Analysis Of Parking LOT Conditions At Insan Mulia Natural School Surabaya). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Pradana, Deva Yudha (2024) Analisis Tingkat Kepuasan Penumpang Terhadap Kinerja dan Operasional Terminal Bus Tipe A Purabaya, Bungurasih, Kabupaten Sidoarjo Berdasarkan Metode IPA. (Analysis Of Passenger Satisfaction Level With Performance and Oprations of Type A Bus Terminal Purabaya,Bungrasi,Sidoarjo District Baset On IPA Method). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Putra, Roudlloh Nur Kusuma (2024) Analisis Penentuan Prioritas Pemeliharaan Bangunan Dengan Metode ”Analytical Hierarchy Process” pada Bangunan Gedung Creative Space Unicorn - Surabaya. (Analysis Of Determining Building Maintenance Priorities Using The "Analitical Hierarchy Process" Method in The Creative Space Unicorn Building in Surabaya). Undergraduate thesis, Universitas 17 agustus 1945.

S

Sarkisian, Kyrra Sandra (2024) Analisa Risiko Faktor Penyebab Keterlambatan Pekerjaan pada Proyek Menggunakan Metode House of Risk (HOR) (Studi Kasus: Proyek Gedung Pusat Terpadu RSUD Sidoarjo). (Risk Analysis of Factor Causing Delays in Work On Projects Using The House of Risk (HOR) Method). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Sutrisno, Wahyu Tri (2024) Analisis Percepatan Waktu dan Biaya pada Proyek Pembangunan Gedung Sekolah Dasar Wachid Hasyim Kota Surabaya Menggunakan Metode Crashing. (Analysis of The Acceleration of Time and Cost in The Construction Project Of Wachid Hasyim Elementary School Building in Surabaya City Using Crashing Method). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

U

Umar, Arjuna Baqhis (2024) Pengaruh Gradasi Agregat Terhadap Karakteristik Fisik dan Mekanik Beton. (Effect of Aggregate Gradation on Physical and Mechanical Characteristics of Concrete). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

W

Wildan, Firdaus (2024) Analisis Pengendalian Waktu Proyek Dengan Metode Line of Balance (LoB) pada Proyek Perumahan Central Park Middle East Ring Road. (Analysis Of Project Time Control Using The LIne Of Balance (LOB) Method On The Central Park Middle East Ring Road Housing Project). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

Z

Zahroh, Alyatus (2024) Evaluasi Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja Pada Proyek Penanganan Jalan Rapa Laok-Karang Penang Kecamatan Omben Kabupaten Sampang. (Evaluation of the Implementation of the Occupational Safety and Health Management System in the Rapa Laok-Karang Penang Road Handling Project, Omben District, Sampang Regency). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

This list was generated on Sun May 19 08:56:55 2024 WIB.