Endriastuti, Alia Maharani (2024) Analisis Biaya Dan Waktu Dengan Metode Time Cost Trade Off (TCTO) Pada Pembangunan Casting Mechanical & Civil Work for Oil Storage and Steady Room Workshop Gresik. (Cost and Time Analysis Using the Time Cost Trade-Off (TCTO) Method in the Construction of Mechanical & Civil Work Casting for Oil Storage and Steady Room Workshop in Gresik). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text (ABSTRAK)
1. ABSTRAK.pdf Download (8MB) |
|
|
Text (BAB I)
2. BAB I.pdf Restricted to Repository staff only Download (131kB) | Request a copy |
|
|
Text (BAB II)
3. BAB II.pdf Restricted to Repository staff only Download (419kB) | Request a copy |
|
|
Text (BAB III)
4. BAB III.pdf Restricted to Repository staff only Download (219kB) | Request a copy |
|
|
Text (BAB IV)
5. BAB IV.pdf Restricted to Repository staff only Download (292kB) | Request a copy |
|
|
Text (BAB V)
6. BAB V.pdf Restricted to Repository staff only Download (237kB) | Request a copy |
|
|
Text (LAMPIRAN)
8. LAMPIRAN.pdf Download (2MB) |
|
|
Text (LOA JURNAL)
LOA JUTIN.pdf Download (85kB) |
|
|
Text (JURNAL TERPUBLISH)
9. JURNAL TERPUBLISH.pdf Restricted to Repository staff only Download (383kB) | Request a copy |
|
|
Text (HASIL TURNITIN)
HASIL TURNITIN.pdf Restricted to Repository staff only Download (159kB) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
Abstract
Di dalam perencanaan suatu proyek disamping variabel waktu dan sumber daya, variabel biaya (cost) mempunyai peranan yang sangat penting. Biaya (cost) yang timbul harus dikendalikan seminim mungkin. Pengendalian biaya harus memperhatikan faktor waktu, karena terdapat hubungan yang erat antara waktu penyelesaian proyek dengan biaya-biaya proyek yang bersangkutan. Penelitian ini dilakukan pada pembangunan Casting Mechanical & Civil Work For Oil Storage And Steady Room Workshop Gresik. Tujuan dari penelitian ini adalah untuk mendapatkan total biaya dan waktu percepatan yang lebih efisien dengan menggunakan metode Time Cost Trade Off (TCTO). Penelitian ini dilakukan dengan cara kompresi atau penekanan terhadap kegiatan-kegiatan yang ada di lintasan kritis. Lintasan kritis didapatkan dari hasil penyusunan kegiatan menggunakan software Microsoft Project. Dari hasil analisis dengan alternatif percepatan penambahan jam kerja (lembur), tahap ke-4 adalah tahap kompresi dengan biaya dan durasi percepatan paling efisien. Didapatkan durasi hasil percepatan untuk 1 jam lembur adalah 175 hari, 2 jam lembur 173 hari, dan 3 jam lembur 172 hari. Sedangkan untuk biaya percepatan didapatkan 1 jam lembur adalah Rp. 3.123.406.448 sedangkan 2 jam sebesar Rp. 3.119.117.964 dan 3 jam lembur sebesar Rp. 3.117.248.350. Dari ketiga durasi tersebut, menghasilkan waktu paling efisien yaitu 172 hari kerja dengan efisiensi waktu sebesar 3,37% dan biaya efisien Rp. 3.117.248.350 dengan efisiensi biaya sebesar 0,42% dengan durasi lembur 3 jam.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | Time Cost Trade Off, crashing, cost, time, efficient |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
| Depositing User: | 1432000018 Alia Maharani Endriastuti |
| Date Deposited: | 13 Feb 2002 19:00 |
| Last Modified: | 13 Feb 2002 19:00 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/32068 |
Actions (login required)
![]() |
View Item |
