Evaluasi Persediaan Bahan Baku, Supplier, dan Tenaga Kerja dalam Proses Produksi di UD. Kasak Paper Bag. (Evaluation of Raw Material Inventory, Suppliers, and Labor in the Production Process at UD. Kasak Paper Bag)

andini, amanda seftia (2026) Evaluasi Persediaan Bahan Baku, Supplier, dan Tenaga Kerja dalam Proses Produksi di UD. Kasak Paper Bag. (Evaluation of Raw Material Inventory, Suppliers, and Labor in the Production Process at UD. Kasak Paper Bag). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

[img]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (895kB) | Preview
[img] Text (BAB I)
BAB I.pdf
Restricted to Repository staff only

Download (420kB) | Request a copy
[img] Text (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (588kB) | Request a copy
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (518kB) | Request a copy
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (304kB) | Request a copy
[img]
Preview
Text (LAMPIRAN)
LAMPIRAN.pdf

Download (1MB) | Preview
[img]
Preview
Text (JURNAL)
Jurnal Tugas Akhir Published.pdf

Download (463kB) | Preview
[img]
Preview
Text (TURNITIN JURNAL)
Turnitin Jurnal Skripsi .pdf

Download (2MB) | Preview
[img]
Preview
Text
LoA Jurnal.pdf

Download (84kB) | Preview

Abstract

UD Kasak Paper Bag is a company engaged in paper bag production. The company faces problems in managing raw material inventory, supplier selection, and workforce planning. Raw material procurement has been carried out based on estimates, resulting in frequent material delays, stock shortages, and production process disruptions. This study aims to determine the appropriate raw material requirements planning, select the best supplier, and calculate workforce requirements so that production targets can be achieved optimally. The methods used include demand forecasting using Moving Average and Weighted Moving Average, raw material requirements planning with Material Requirement Planning (MRP), supplier selection using Simple Additive Weighting (SAW), and labor requirements calculation based on standard work time. The results show that the Moving Average method is the best forecasting method with a MAD value of 503.7 and MAPE 3.80%. The MRP calculation using the Lot For Lot (LFL) method results in a total inventory cost of Rp16,530,000, lower than the Period Order Quantity (POQ) method. The results of supplier selection show that supplier A2 obtained the highest preference value of 0.818 and was therefore designated as the main supplier. Furthermore, the 31-person workforce requirement aligns with the company's current situation. The implementation of PPIC and Supply Chain Management (SCM) can improve inventory control, production flow, and operational efficiency.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Perencanaan dan Persediaan Bahan Baku, Material Requirement Planning (MRP), Supply Chain Management (SCM), Simple Additive Weighting (SAW), Stopwatch Time Study
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri
Depositing User: 1412200136 Amanda Seftia Andini
Date Deposited: 24 Aug 2026 05:23
Last Modified: 24 Aug 2026 05:23
URI: http://repository.untag-sby.ac.id/id/eprint/46898

Actions (login required)

View Item View Item