Analisis Faktor Yang Mempengaruhi Sistem Upah Tenaga Kerja Konstruksi Terhadap Produktifitas Pada Proyek Pembangunan Gedung Unit Layanan Pengadaan (ULP) Di Bangkalan

Afrianto, Dio Sukarisma (2021) Analisis Faktor Yang Mempengaruhi Sistem Upah Tenaga Kerja Konstruksi Terhadap Produktifitas Pada Proyek Pembangunan Gedung Unit Layanan Pengadaan (ULP) Di Bangkalan. Masters thesis, Untag 1945 Surabaya.

[img] Text
Abstrak.pdf

Download (557kB)
[img] Text
BAB 1.pdf

Download (340kB)
[img] Text
BAB 2.pdf

Download (800kB)
[img] Text
BAB 3.pdf

Download (416kB)
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB 5.pdf

Download (323kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (305kB)

Abstract

In general, wage can give some motivation to construction workers, but how far the effect of contract waging and daily waging system, it is necessary to be researched. This study aims to find the difference in the productivity of workers who are paid in piece with those who are paid daily in the ULP Building Construction Project in Bangkalan. In addition, the factors that most influence the productivity of 5 variables are also examined: education, experience, age, work discipline and motivation. The research was done by field observation, interview and questionnaire. The data obtained from the questionnaire are processed by giving score in advance, and then ship used to examine the validity and reliability of the instrument. The relation between the productivity and the above four variables is clarified through the multiple regression analysis which is tested by using F test, T test, Normality test, Non-multicollinierity test, Homoscedasticity test, and Non-autocorrelation test. The results showed that the piece rate system provides greater productivity than the daily wage productivity, namely the productivity value of piece workers = 4.93 m2 / day, and for daily workers = 3.682 m2 / day. The wage payment system for daily and piece workers is very influential on work productivity. That is, piece rate workers earn 49.8% more than daily workers. With this difference the productivity of piece workers is 33.9% greater than the productivity of daily workers. From the results of multiple linear regression analysis, it can be concluded that the most dominant variable on daily and piece labor productivity is work motivation.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Productivity, Manpower, Waging System.
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 24 Mar 2021 03:46
Last Modified: 18 Jul 2022 04:23
URI: http://repository.untag-sby.ac.id/id/eprint/8666

Actions (login required)

View Item View Item