Diari, Ni Ketut Alit Paramita (2026) Analisis Jumlah Tenaga Kerja untuk Evaluasi Produksi Berbahan Plastik dengan Metode Cardiovascular Load dan Full Time-Equivalent (Studi Kasus di CV. Serba Jaya Oke). (Workforce Size Analysis for the Evaluation of Plastic-Based Production Using Cardiovascular Load and Full-Time Equivalent Methods (A Case Study at CV. Serba Jaya Oke)). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text
ABSTRAK.pdf Download (1MB) | Preview |
|
|
Text
BAB 1.pdf Restricted to Repository staff only Download (304kB) | Request a copy |
||
|
Text
BAB 2.pdf Restricted to Repository staff only Download (607kB) | Request a copy |
||
|
Text
BAB 3.pdf Restricted to Repository staff only Download (351kB) | Request a copy |
||
|
Text
BAB 4.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text
BAB 5.pdf Restricted to Repository staff only Download (352kB) | Request a copy |
||
|
Text
LAMPIRAN.pdf Download (2MB) | Preview |
|
|
Text
JURNAL.pdf Download (627kB) | Preview |
|
|
Text
JURNAL TURNITIN.pdf Download (3MB) | Preview |
|
|
Text
LoA.pdf Download (145kB) | Preview |
Abstract
CV. Serba Jaya Oke is a manufacturing company engaged in producing eskan and sealwer products, where work systems still require evaluation related to workload and labor adequacy. This study aims to analyze workers’ physical workload, determine standard time for each production activity, and evaluate workforce adequacy based on job requirements. The results show that the average physical workload using the Cardiovascular Load (%CVL) method ranges from 31.14% to 44.04%, indicating a need for improvement. The total standard time for eskan production is 496,439 seconds, while sealwer is 491,996 seconds. Workforce evaluation using the Full Time Equivalent (FTE) method indicates overload conditions in the body finishing and QC stations with values of 1.66 and 1.89. Recommendations include improving work methods, optimizing rest schedules, and adding 4 workers with a total cost of Rp12.000.000,00 to balance workload and enhance productivity
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | Beban Kerja, Tenaga Kerja, Full-Time Equivalent (FTE), Cardiovascular Load (CVL), Produktivitas. |
| Subjects: | T Technology > TS Manufactures |
| Divisions: | Fakultas Teknik > Program Studi Teknik Industri |
| Depositing User: | 1412200080 Ni Ketut Alit Paramita Diari |
| Date Deposited: | 24 Aug 2026 04:31 |
| Last Modified: | 24 Aug 2026 04:31 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/46993 |
Actions (login required)
![]() |
View Item |
