Analisis Faktor-Faktor Yang Berpengaruh Dalam Pemutusan Kontrak Pada Pekerjaan Saluran Afvour di Kabupaten Bangkalan

Febrianti, Maharani (2020) Analisis Faktor-Faktor Yang Berpengaruh Dalam Pemutusan Kontrak Pada Pekerjaan Saluran Afvour di Kabupaten Bangkalan. Masters thesis, Untag Surabaya.

[img] Text
Abstrak.pdf

Download (399kB)
[img] Text
Bab 1.pdf

Download (144kB)
[img] Text
Bab 3.pdf

Download (188kB)
[img] Text
Bab 4.pdf
Restricted to Repository staff only

Download (290kB)
[img] Text
Bab 5.pdf

Download (274kB)

Abstract

The construction of the afvour channel is one of the construction works where the implementation is also not free from various problems ranging from design incompatibility, undirected communication, uncertain material prices to inaccurate completion times. These incidents often end with the termination of the contract. Because of the termination of the contract will cause losses for both partiesParty. For service users will have an internal impact that is the implications on the assessment of. performance resulting from job failures and low budget realization.For service providers will have implications for its performance assessment, lossesmaterials and even sanctions–other sanctions including will be included in the list ofBlack. It is not uncommon for contract terminations to lead to disputes or disputes between users and service providers, and this can come to the table Green.Given the considerable influence that will occur when a breakup occurs, contract, then the author tries to analyze the main causesbreak the contract by using a questionnaire method that will Distributed to several service users and service providers. Results of deployment. Questionnaire will be processed using SPSS so that the data got bywith the purpose of the author. The results of the study are factors that affect the termination of construction contracts inBangkalan Regency there are materials and equipment(X1), time and cost (X2) and project failure (X3). Time and cost factorshave the most dominant level of influence over the breakup of thisdescribed the time and cost risk regression coefficient (X2) has a0.712 with a significance of 0.483. Because testing is supported by. Significance of 0.000(p < 0.05). The Time variable. And cost (X2) has a significant effect on the project drop variable (Y).These findings contain the understanding that the increase or decrease in relativemany at the risk of Time and Cost will lead to an increase in therisk of disconnecting the project.

Item Type: Thesis (Masters)
Uncontrolled Keywords: factors affecting the discontinuation of contract, termination of contract, building construction
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 24 Mar 2021 23:33
Last Modified: 18 Jul 2022 05:42
URI: http://repository.untag-sby.ac.id/id/eprint/8685

Actions (login required)

View Item View Item