AKSE, NYDIA YULIANA (2022) Cost and Time Analysis with Critical Path Method (CPM) on Passenger Terminal Development Project Type a Kupang City Phase IV. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
Text
ABSTRAK.pdf Download (764kB) |
|
Text (BAB I)
BAB I.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
Text (BAB II)
BAB II.pdf Restricted to Repository staff only Download (8MB) | Request a copy |
|
Text (BAB III)
BAB III.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
|
Text (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (5MB) | Request a copy |
|
Text (BAB V)
BAB V.pdf Restricted to Repository staff only Download (715kB) | Request a copy |
|
Text
LAMPIRAN.pdf Download (9MB) |
|
Text
JURNAL.pdf Download (457kB) |
|
Text
JURNAL TURNITIN.pdf Download (2MB) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
Abstract
Planning and controlling costs and time is part of overall construction management. Problems that often occur during the implementation of project work resulted in a lot of work construction is experiencing problems so that construction work is experiencing delay or stall. This Final Project Research was conducted in Kupang City Type A Passenger Terminal Construction Project Phase IV because the project was delayed. Therefore, at in this research, time and cost analysis will be carried out using Critical Path Method and Crashing Program to find out the cost and time acceleration of the City A Type A Passenger Terminal Construction project Kupang Phase IV. Based on the analysis carried out on the project using Critical Path Method and Crashing Program, so researchers can find out duration of costs and acceleration time on the project after adding working hours (overtime) on work that is on the critical path so that the project completion time was obtained for 15 weeks from the time originally planned for 17 weeks with additional costs after accelerated time that is equal to Rp. 68,250,000.00 or 1.7% of initial cost Rp. 3,834,834,352.41. So the total cost on the Development Project Passenger Terminal after acceleration is Rp.3,903,084,352.41.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Critical Path Method, Crashing program, Microsoft project, Aceeleration |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | 1431700040 Nydia Yuliana Akse |
Date Deposited: | 21 Mar 2022 11:13 |
Last Modified: | 19 May 2022 08:31 |
URI: | http://repository.untag-sby.ac.id/id/eprint/15295 |
Actions (login required)
View Item |