![]() | Up a level |
Wahyudi, Dwi Nur (2025) Implementasi BIM Dengan Autodesk Revit 2025 Pada Quantity Take-Off Material Struktur Gedung Plaza Airlangga (Unair) Tahap 1 Terhadap Volume, Biaya Dan Waktu. (BIM Implementation Using Autodesk Revit 2025 for Structural Material Quantity Take-Off of the Plaza Airlangga (Unair) Building (Phase 1): Analysis of Volume, Cost, and Time). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.