Up a level |
Sujarwo, Aris (2022) Analisis Kinerja Terhadap Waktu Dan Biaya Dengan Menggunakan Metode Earned Value Pada Proyek Pembangunan Gedung IKFM, IPS Dan Parkir Kendaraan Karyawan RSUD Sidoarjo (Performance Analysis of Time and Costs Using the Earned Value Method in the IKFM, IPS Building Construction Project and Vehicle Parking for Sidoarjo Hospital Employees). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.