Items where Author is "Kurniawan, Fajar"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Kurniawan, Fajar (2020) Analisis Waktu Pelaksanaan Proyek Dengan Menggunakan Metode CPM – PERT Pada Pembangunan Gedung SDN Bibis 113 Surabaya. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

This list was generated on Sat May 4 12:33:56 2024 WIB.