![]() | Up a level |
Bahrudin, M. Sulton (2025) Penerapan Metode Earned Value Method (EVM) Dalam Menganalisis dan Pengendalian Waktu, Biaya Proyek Konstruksi Jalan Pada Ruas Jalan Bungur-Kedoyo Kabupaten Tulungagung. (Application of The Earned Value Management (EVM) Method In Analyzing and Controlling Time and Cost In A Road Construction Project On The Bungur-Kedoyo Road Section, Tulungagung Regency). Masters thesis, Universitas 17 Agustus 1945 Surabaya.