Analisis Pebandingan Waktu dan Biaya Proyek Kontruksi Dengan Penambahan Jam Kerja (Studi kasus : Pembangunan jalan raya Manatuto – Laclubar. Sta 87+000 – 90+000)

Costa, Oscar Francisco Noronha Da (2021) Analisis Pebandingan Waktu dan Biaya Proyek Kontruksi Dengan Penambahan Jam Kerja (Studi kasus : Pembangunan jalan raya Manatuto – Laclubar. Sta 87+000 – 90+000). Masters thesis, Untag 1945 Surabaya.

[img] Text
Abstrak.pdf

Download (239kB)
[img] Text
Bab 1.pdf

Download (208kB)
[img] Text
Bab 2.pdf

Download (325kB)
[img] Text
Bab 3.pdf

Download (279kB)
[img] Text
Bab 4.pdf
Restricted to Repository staff only

Download (204kB)
[img] Text
Bab 5.pdf

Download (164kB)

Abstract

The country of Timor Leste is a developing country, so maximum development is needed, in order to support the development level of the country concerned, one of them is the development of roads in remote districts. In the construction of a project is usually influenced by several factors, including good resources, quality and quantity, availability of materials, natural condition, geographical location and other factors. However, with so many factors there is the main thing that is most fundamental is the cost of the project. In writing this thesis, the author wants to analyze the construction of new roads, which are required costs and time after accelerating working hours, also analyzing the comparison of project costs and time under normal conditions, and conditions after additional working hours. This proyek was delayed due to heavy rain at the project site on the IV week and V week, so that there was no delay in the project, the alternative acceleration used was the addition of working hours, from one hour to four hours without any additional workforce. The project used in this research is the road and bridge project of manatuto 1440 days, at a cost of Rp. 420.177.824.100. This final project used the Time Cost Trade Off (TCTO) method as a solution to overcome delays, namely the project scheduling method by exchanging time and costs. The results showed that from the results of rescheduling the project development by applying the Time Cost Trade Off (TCTO) method, the total cost due to acceleration was Rp. 424.985.502.94 from the previous cost of Rp. 420.177.824.100, there was an additional cost of Rp. 4.807.679.840 and the completion time due to acceleration was 1430 days from the completion duration of 1440 days so acceleration was needed, 10 days for the project to be completed planned

Item Type: Thesis (Masters)
Uncontrolled Keywords: new road project, acceleration of project completion TCTO
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 26 Mar 2021 00:36
Last Modified: 31 Aug 2021 14:50
URI: http://repository.untag-sby.ac.id/id/eprint/8711

Actions (login required)

View Item View Item