Analisis Kinerja Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Urusan Agama Labang Bangkalan

Indriawati, Yuni (2021) Analisis Kinerja Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Gedung Kantor Urusan Agama Labang Bangkalan. Masters thesis, Untag Surabaya.

[img] Text
ABSTRAK.pdf

Download (1MB)
[img] Text (BAB I)
Bab 1.pdf
Restricted to Repository staff only

Download (807kB)
[img] Text (BAB II)
Bab 2.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB III)
Bab 3.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV)
Bab 4.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB V)
Bab 5.pdf
Restricted to Repository staff only

Download (674kB)
[img] Text
Daftar Pustaka.pdf

Download (797kB)

Abstract

The project of Religious Affairs Office Construction on Labang Bangkalan is one of the government project, so that the construction work on the building must be completed on time. So that the services and comfort of the service users and employees at the Office of Religious Affairs can return to normal.To achieves this requires a control that must be known in advance through the performance of an ongoing project. The Earned Value Analysis method is one ways to determine the performance of the project by integrating aspects of cost, time and work performance. So that the Earned Value Analysis method is applied to the project of Religious Affairs Office Construction on Labang Bangkalan. The Earned Value Analysis method is used to determine the time delay and cost overruns that occur by evaluating time performance and cost performance, using indicators Actual Cost of Work Performed (ACWP), Budgeted Cost of Work Performed (BCWP) dan Budgeted Cost of Work Scheduled (BCWS). Performance control is reviewed at week 8 with the results of calculation analysis for ACWP of 42.80%, BCWP of 58%, BCWS of 65.3%, for cost performance index analysis at week 8 the Cost Performance Index (CPI) is 1.36> 1 or the expenditure on the week is less than the budget plan (saving) and for time performance index analysis at week 8 the Schedule Performance Index (SPI) is 0.89 < 1 or the project implementation is delayed. Meanwhile, for cost analysis the Estimate at Completion (EAC) was obtained at73.68% or Rp. 767.722.236,68 and for time analysis the Time Estimate (TE) 12.4% slower or for 11 days in calendar.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Earned Value Analysis, Tardiness
Subjects: T Technology > TH Building construction
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 25 Mar 2021 01:38
Last Modified: 08 Feb 2024 12:04
URI: http://repository.untag-sby.ac.id/id/eprint/8693

Actions (login required)

View Item View Item