Permadi, Rama (2026) Perencanaan Kebutuhan Bahan Baku pada Produksi Bak Dropside Truk (Studi Kasus di CV. Karya Cipta Baru). (Raw Material Requirements Planning for Truck Dropside Bed Production (Case Study at CV. Karya Cipta Baru)). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text (ABSTRAK)
ABSTRAK.pdf Download (1MB) | Preview |
|
|
Text (BAB I)
BAB I.pdf Restricted to Repository staff only Download (713kB) | Request a copy |
||
|
Text (BAB II)
BAB II.pdf Restricted to Repository staff only Download (800kB) | Request a copy |
||
|
Text (BAB III)
BAB III.pdf Restricted to Repository staff only Download (713kB) | Request a copy |
||
|
Text (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text (BAB V)
BAB V.pdf Restricted to Repository staff only Download (769kB) | Request a copy |
||
|
Text (LAMPIRAN)
LAMPIRAN.pdf Download (1MB) | Preview |
|
|
Text (LOA JURNAL)
LoA+JUTIN+Permadi.pdf Download (85kB) | Preview |
|
|
Text (JURNAL)
JURNAL.pdf Restricted to Repository staff only Download (280kB) | Request a copy |
||
|
Text (JURNAL TURNITIN)
JURNAL TURNITIN.pdf Restricted to Repository staff only Download (374kB) | Request a copy |
Abstract
CV. Karya Cipta Baru is a company engaged in the construction of commercial vehicles that produces various types of truck bodies, with a primary focus on dropside truck bodies. The raw material procurement system that is carried out based on immediate needs causes the company to be at risk of experiencing material shortages, thus hampering the production process and causing losses due to customer requests that cannot be met on time. This study aims to plan raw material requirements using the Material Requirement Planning (MRP) method and analyze efforts to minimize losses due to material unavailability. The method used is MRP with the Lot For Lot (LFL) technique, namely ordering materials according to net needs for each production period. The results of the study show that material orders were made 6 times during the period from January to May with a total material requirement including 352 sheets of 3.5 mm plate iron, 528 UNP iron rods, 412 butterfly hinges, 67 sheets of 6 mm plate iron, 67 CNP iron rods, and 330 M8 bolts. Before the implementation of MRP, the company experienced a loss of Rp108,054,000 per year consisting of lost sales of Rp108,000,000 and overtime costs of Rp54,000. The implementation of the LFL MRP technique resulted in more accurate raw material requirements planning, reduced the risk of stockouts, guaranteed material availability, and helped minimize the company's potential losses.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | Material Requirements Planning (MRP), Stockout Cost Analysis, lost sales, Raw Material Planning |
| Subjects: | T Technology > TS Manufactures |
| Divisions: | Fakultas Teknik > Program Studi Teknik Industri |
| Depositing User: | 1412200043 Rama Permadi |
| Date Deposited: | 26 Aug 2026 06:04 |
| Last Modified: | 01 Oct 2026 03:13 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/46918 |
Actions (login required)
![]() |
View Item |