HENDRAKUSUMA, INTANNIARTA (2025) Rancang Bangun Sistem Monitoring Proyek Konstruksi Berbasis Metode Jalur Kritis: Studi Kasus PT. Surya Langit Bumi. (Design and Development of a Construction Project Monitoring System Based on the Critical Path Method: A Case Study of PT. Surya Langit Bumi). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text
ABSTRAK.pdf Download (913kB) | Preview |
|
|
Text
BAB 1.pdf Restricted to Repository staff only Download (225kB) |
||
|
Text
BAB 2.pdf Restricted to Repository staff only Download (307kB) |
||
|
Text
BAB 3.pdf Restricted to Repository staff only Download (1MB) |
||
|
Text
BAB 4.pdf Restricted to Repository staff only Download (1MB) |
||
|
Text
BAB 5.pdf Restricted to Repository staff only Download (228kB) |
||
|
Text
LAMPIRAN.pdf Download (451kB) | Preview |
|
|
Text
REVISI-JRSIT_Teknik_ 1462100087_Intanniarta Hendrakusuma.pdf Download (830kB) | Preview |
|
|
Text
Submit Jurnal.pdf Download (39kB) | Preview |
|
|
Text
TURNITIN-INTANNIARTA HENDRAKUSUMA-1462100087.pdf Download (1MB) | Preview |
Abstract
Advances in information technology have made things easier in many areas, including construction project management. This study aims to design and develop a web-based project monitoring information system for PT. Surya Langit Bumi. The system is designed to improve efficiency in monitoring project progress, integrate digital reporting, and perform critical path calculations (Critical Path Method). Currently, project reporting at PT. Surya Langit Bumi is still done manually using Microsoft Excel, which often causes challenges in data management and timely reporting. The research methods used included observation, interviews, and literature studies, with a software development approach using the Waterfall method. This information system provides features for project management, tasks, documentation, reports, and CPM calculations. The implementation of this system is expected to improve reporting efficiency, reduce the risk of delays, and support better project evaluation. Testing was conducted using the System Usability Scale (SUS) method to assess user satisfaction with the system. The results indicate that this system is effective in meeting the needs of construction project monitoring in an efficient and integrated manner.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | Sistem Informasi Monitoring, Proyek Konstruksi, System Usability Scale, Critical Path Method, Waterfall. |
| Subjects: | Q Science > QA Mathematics > QA76 Computer software |
| Divisions: | Fakultas Teknik > Program Studi Teknik Informatika |
| Depositing User: | 1462100087 Intanniarta Hendrakusuma |
| Date Deposited: | 27 Aug 2026 05:47 |
| Last Modified: | 27 Aug 2026 05:47 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/45730 |
Actions (login required)
![]() |
View Item |
