Analisis Biaya Siklus Hidup Pada Pemeliharaan Pekerjaan Preservasi Jalan Kawasan Ibukota Keamatan (IKK) Gunung Tabur Kabupaten Berau. (Life Cycle Cost Analysis on The Maintenance of The Road Preservation Project in Kawasan, District Capital (IKK) of Gunung Tabur, Berau Regency).

Saputra, Dhani (2025) Analisis Biaya Siklus Hidup Pada Pemeliharaan Pekerjaan Preservasi Jalan Kawasan Ibukota Keamatan (IKK) Gunung Tabur Kabupaten Berau. (Life Cycle Cost Analysis on The Maintenance of The Road Preservation Project in Kawasan, District Capital (IKK) of Gunung Tabur, Berau Regency). Masters thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (268kB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (159kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (281kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (290kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (210kB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (189kB)
[img] Text
LOA.pdf

Download (269kB)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)

Abstract

This study aims to analyze the total Life Cycle Cost (LCC) of the road reservation maintenance project in Kanasan, District Capital (IKK) of Gunung Tabur, Berau Regency, over a 12-year period. The main focus is to determine the total LCC as well as the contribution of each cost component, namely the Initial Cost and Maintenance Cost. The research uses a descriptive quantitative approach with systematic analysis of construction and maintenance cost data. The results show that the total LCC of the project is IDR 22,811,802,000, consisting of an Initial Cost of IDR 19,528,342,000 and a Maintenance Cost of IDR 3,283,460,000, after adjusting for an annual inflation rate of 3.1%. The Initial Cost contributes 85.6% to the total LCC, while the Maintenance Cost contributes 14.4%. These findings highlight the importance of considering maintenance costs in long-term infrastructure budgeting, even though their proportion is relatively smaller than the initial construction costs.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Life Cycle Cost, Initial Cost, Biaya Pemeliharaan, Jalan, Infrastruktur.
Divisions: Fakultas Teknik > magister teknik sipil
Depositing User: MTS Magister Teknik Sipil 2025
Date Deposited: 20 Sep 2001 20:31
Last Modified: 20 Sep 2001 20:31
URI: http://repository.untag-sby.ac.id/id/eprint/41726

Actions (login required)

View Item View Item