Studi Kelayakan Pembangunan Sistem Penyediaan Air Minum (SPAM) Hilir Jatiluhur 1 Untuk Pelayanan Kecamatan Teluk Jambe, Kecamatan Pangkalan dan Kecamatan Tegal Waru Kabupaten Karawang Jawa Barat. (Feasibility Study of The Development of Downstream Jatiluhur 1 Drinking Water Supply System (SPAM) For The Service of Teluk Jambe District, Pangkalan District and Tegal Waru District, Karawang Regency, West Java).

Sadeli, Ahmad (2025) Studi Kelayakan Pembangunan Sistem Penyediaan Air Minum (SPAM) Hilir Jatiluhur 1 Untuk Pelayanan Kecamatan Teluk Jambe, Kecamatan Pangkalan dan Kecamatan Tegal Waru Kabupaten Karawang Jawa Barat. (Feasibility Study of The Development of Downstream Jatiluhur 1 Drinking Water Supply System (SPAM) For The Service of Teluk Jambe District, Pangkalan District and Tegal Waru District, Karawang Regency, West Java). Masters thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (260kB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (204kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (301kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (304kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (629kB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (206kB)
[img] Text
LOA.pdf

Download (269kB)
[img] Text
JURNAL.pdf
Restricted to Repository staff only

Download (472kB)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)

Abstract

This study aims to evaluate the feasibility of the development of the Downstream Jatiluhur 1 Drinking Water Supply System (SPAM) which is planned to serve the Teluk Jambe District, Pangkalan District, and Tegal Waru District in Karawang Regency, West Java. This study includes an analysis of investment and operational cost requirements as well as financial feasibility based on four main indicators, namely Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP). The results of the analysis show that the project requires an initial investment of IDR 19,575 million and is projected to generate cumulative revenue of IDR 61,934 million during the project's life. The financial feasibility evaluation resulted in an NPV of Rp 4,269 million (positive), an IRR of 12.7% which exceeds the 10% discount rate, a BCR of 1.22, and a Payback Period of 7 years and 9 months. These four indicators indicate that this project is economically and financially feasible. Therefore, the construction of SPAM Hilir Jatiluhur 1 is highly recommended as a solution for providing sustainable clean water in the target area.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Feasibility study, SPAM, investment, NPV, IRR, BCR, Payback Period, Karawang.
Divisions: Fakultas Teknik > magister teknik sipil
Depositing User: MTS Magister Teknik Sipil 2025
Date Deposited: 20 Sep 2001 20:13
Last Modified: 20 Sep 2001 20:13
URI: http://repository.untag-sby.ac.id/id/eprint/41722

Actions (login required)

View Item View Item