Budhi, Muhammad Setia (2025) Penyelesaian Pekerjaan Stadion Surajaya di Kabupatan Lamongan dengan Biaya Balance Budget Melalui Rekayasa Nilai (Completion of Surajaya Stadium Works in Lamongan District with Balance Budget Cost Through Value Engineering). Masters thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text (ABTRAK)
ABSTRAK.pdf Download (1MB) |
|
|
Text (BAB I)
BAB I.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB II)
BAB II.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB III)
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB IV)
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V)
BAB V.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (LAMPIRAN)
LAMPIRAN.pdf Restricted to Repository staff only Download (1MB) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) |
Abstract
The construction of Surajaya Stadium in Lamongan Regency faces a shortage of implementation costs after 0% Mutual Check. The total contract value of Rp. 252.965.579.881 (excluding VAT). This cost shortfall is due to the addition of new volumes and work items to meet FIFA standards. Given that the proposed additional costs could not be approved, the handover of the land to the Contractor delayed by up to 30 days, therefore, value engineering measures are required so that the project can be completed without increasing the costs and duration of the work. The steps taken included: 1) Information Stage, by calculating the percentage of cost against the contract value and focusing on large weighted works, using Pareto; 2) Creative Stage, by designing alternative ideas to fulfill the main function of the stadium; 3) Analysis Stage, which is the analysis of the works to be Value Engineering. The AHP method is also used to help analyze the determination of choices; 4) Recommendation Stage, compiling reports and recommendations for optimal new designs to save costs; and 5) Development Stage, compiling written suggestions for the best alternatives that meet economic and technical criteria to be evaluated and implemented. With this approach, it is expected that the Surajaya Stadium project can be completed within the specified budget. This study resulted in: Architectural Work: 27.201%, Structural Work: 21.696%, Soccer Field, FOP Lights, and Scoreboard Work: 14.645%, Mechanical, Electrical, and Electronic Work: 13.525%, and Foundation Work: 8.450% are the main items that can be optimized, with a cumulative contribution of 85.517% of the total project cost. The application of Value Engineering resulted in cost savings of IDR 4.134.655.440 and time efficiency of up to 93 days. This finding confirms that Value Engineering is effective in improving cost and time efficiency in construction projects.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | AHP, Dynamic Tests, Foundation, Pareto, Value Engineering |
| Divisions: | Fakultas Teknik > magister teknik sipil |
| Depositing User: | MTS Magister Teknik Sipil 2025 |
| Date Deposited: | 23 Aug 2001 18:14 |
| Last Modified: | 23 Aug 2001 18:14 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/41155 |
Actions (login required)
![]() |
View Item |
