Evaluasi Penjadwalan dan Biaya Pemeliharaan Jalan Soekarno Ruas 3 Kota Blitar Dengan Metode Time Cost Trade Of Analysis (TCTO). (Evaluation of Scheduling and Maintenance Costs of Soekarno Road Section 3 Blitar City Using The Time Cost Trade Of Analysis (TCTO) Method).

Permadi, Eka Shodiq (2025) Evaluasi Penjadwalan dan Biaya Pemeliharaan Jalan Soekarno Ruas 3 Kota Blitar Dengan Metode Time Cost Trade Of Analysis (TCTO). (Evaluation of Scheduling and Maintenance Costs of Soekarno Road Section 3 Blitar City Using The Time Cost Trade Of Analysis (TCTO) Method). Masters thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (1MB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
LAMPIRAN.pdf

Download (2MB)
[img] Text
LOA I.pdf

Download (1MB)
[img] Text
LOA II.pdf

Download (1MB)
[img] Text
JURNAL TURNITIN.pdf
Restricted to Repository staff only

Download (1MB)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)

Abstract

Implementation of construction projects is closely related to time and costs because a construction project is limited by the time and costs agreed upon in the Road Periodic Maintenance Project contract on Jl. Ir. Soekarno Section 3 Blitar City. Road Periodic Maintenance Project on Jl. Ir. Soekarno Section 3 Blitar City is planned to be completed within 120 days at a cost of Rp. 1,165,563,000.00. However, in reality on the ground, project work cannot be carried out according to plan. Road Periodic Maintenance Project on Jl. Ir. Soekarno Section 3 experienced a delay of around 8 days so that the project completion duration took longer. This research aims to overcome this delay by conducting an acceleration analysis using one of the acceleration methods, namely Time Cost Trade Off (TCTO). This method is a method of analyzing construction work by changing the duration of project completion so that the costs incurred also change. This method is used to speed up the completion of construction work with low additional costs. The conclusion after analyzing by adding 2 hours of project work time (overtime hours) was that the work time was 117 working days with a time saving of around 3 days from the normal project duration which was originally 120 days, while the work cost was around Rp. 1,342,177,724 by determining the critical path in asphalt pavement work and Porous Material Calculation work

Item Type: Thesis (Masters)
Uncontrolled Keywords: Time, Cost, Time Cost Trade Off (TCTO)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > magister teknik sipil
Depositing User: MTS Magister Teknik Sipil 2025
Date Deposited: 08 Mar 2001 15:29
Last Modified: 28 Dec 2001 19:26
URI: http://repository.untag-sby.ac.id/id/eprint/37715

Actions (login required)

View Item View Item