Putra, Marcellino Syah (2024) Analisis Network Planning Dengan Metode Critical Path Method (CPM) Pada Pembangunan Rumah Tinggal di Ngablak Rejo Gang Dahlia Kecamatan Menganti. (Network Planning Analysis Using the Critical Path Method (CPM) in Residential Construction in Ngablak Rejo, Dahlia Alley, Menganti District). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text (ABSSTRAK)
ABSTRAK MARCELL.pdf Download (8MB) |
|
|
Text (BAB 1)
BAB 1.pdf Restricted to Repository staff only Download (64kB) | Request a copy |
|
|
Text (BAB 2)
BAB 2.pdf Restricted to Repository staff only Download (284kB) | Request a copy |
|
|
Text (BAB 3)
BAB 3.pdf Restricted to Repository staff only Download (34kB) | Request a copy |
|
|
Text (BAB 4)
BAB 4.pdf Restricted to Repository staff only Download (226kB) | Request a copy |
|
|
Text (BAB 5)
BAB 5.pdf Restricted to Repository staff only Download (79kB) | Request a copy |
|
|
Text (LAMPIRAN)
LAMPIRAN.pdf Download (475kB) |
|
|
Text (JURNAL)
jurnal sebelum turnitin.pdf Download (361kB) |
|
|
Text (JURNAL TURNITIN)
Analisis Network Planning Dengan Metode Critical Path Method (Cpm) Pada Pembangunan Rumah Tinggal Di Ngablak Rejo Gang Dahlia Kecamatan Menganti.pdf Download (2MB) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
Abstract
Optimal time for completing construction work really needs to be applied, so that what is done is effective and does not waste a lot of time. In completing a development project, optimal time is needed, so that there are no delays within the specified time. This causes the costs required to increase and the work becomes less effective. This research uses the CPM (Critical Path Method), which is a method for determining the critical path in network analysis for a series of activities carried out, so that the work carried out is optimal and effective. The results obtained in this research are for optimal activities in completing the residential construction project in Ngblak Rejo, namely initially a time period of 94 days was determined at a cost of Rp. 256,306,000 then using the CPM Method (Critical Path Method) can be completed within 75 days at a cost of Rp. 204,498,700. This will save 19 days of time and cost Rp. 51,807,300.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | critical path method (cpm), optimal time, residential home |
| Subjects: | Z Bibliography. Library Science. Information Resources > Z665 Library Science. Information Science |
| Divisions: | Fakultas Ekonomi dan Bisnis > Program Studi Ekonomi Manajemen |
| Depositing User: | 1212000248 Marcellino Syah Putra |
| Date Deposited: | 15 Nov 2001 17:50 |
| Last Modified: | 15 Nov 2001 17:50 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/35009 |
Actions (login required)
![]() |
View Item |
