Analisis Percepatan Proyek Menggunakan Metode PDM dengan Shift Kerja dan Penambahan Jam Lembur (Studi Kasus : Proyek HE-CCCW di PT. PAL Indonesia (Persero). (Project Acceleration Analysis Using the PDM Method with Work Shifts and Additional Overtime Hours (Case Study: HE-CCCW Project at PT. PAL Indonesia (Persero)).

Huda, Moh Samsul (2019) Analisis Percepatan Proyek Menggunakan Metode PDM dengan Shift Kerja dan Penambahan Jam Lembur (Studi Kasus : Proyek HE-CCCW di PT. PAL Indonesia (Persero). (Project Acceleration Analysis Using the PDM Method with Work Shifts and Additional Overtime Hours (Case Study: HE-CCCW Project at PT. PAL Indonesia (Persero)). Undergraduate thesis, Untag 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (2MB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (9MB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (7MB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (458kB)
[img] Text
DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (275kB)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg
Restricted to Repository staff only

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)

Abstract

A project can be said to succeed if can be delivered on time, purchasing on right track and fulfill the fixed quality standards. However, many cases on projects often get delays and cost overruns in the same time. Controlling Projects which have experienced delay could be done with doing rescheduling to do acceleration. Precedence Diagram Methods (PDM) is one of method that used to make a network planning especially on project rescheduling. This Research would analyzed how to plan a proper project’s acceleration, in this case is for HE-CCCW (Heat Exchanger Closed Cooling Circulating Water) which is provided by PT. PAL Indonesia (persero) for PT. Indonesia Power. using PDM Program comparing between 2 (two) acceleration’s alternatives. The result from this calculation on both acceleration’s alternatives, The Shifting Method is more efficient due to its capabilities to reduce the working days from 255 days to 229 days, 26 days of reduction or 10,19%. The additional cost causing by this acceleration is Rp. 5.459.000 or 0.75% from the Project’s Basic Cost Rp. 726.047.000.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Precedence Diagram Metode (PDM), Project Rescheduling, Acceleration, Working Shift.
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Program Studi Teknik Industri
Depositing User: Users 26 not found.
Date Deposited: 04 Jan 2022 03:44
Last Modified: 11 Apr 2001 15:03
URI: http://repository.untag-sby.ac.id/id/eprint/13441

Actions (login required)

View Item View Item