Earned Value Analysis Sebagai Evaluasi Kinerja Biaya dan Waktu Pada Pembangunan Infrastruktur Fly Over Purwosari Surakarta Jawa Tengah

Masqur, Zaenal (2020) Earned Value Analysis Sebagai Evaluasi Kinerja Biaya dan Waktu Pada Pembangunan Infrastruktur Fly Over Purwosari Surakarta Jawa Tengah. Masters thesis, Untag Surabaya.

[img] Text
Abstrak.pdf

Download (2MB)
[img] Text
BAB 1.pdf
Restricted to Repository staff only

Download (566kB)
[img] Text
BAB 2.pdf
Restricted to Repository staff only

Download (882kB)
[img] Text
BAB 3.pdf
Restricted to Repository staff only

Download (629kB)
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text
BAB 5.pdf
Restricted to Repository staff only

Download (702kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (397kB)

Abstract

The construction of the fly over in the Purwosari area, precisely at Jalan Slamet Riyadi, is based on a level crossing with the railroad which causes traffic at the cross to stop completely when a train passes. With the construction of a fly over at the crossing, it is calculated that the traffic flow on Jalan Slamet Riyadi will become smoother, this can be seen from the degree of saturation of the road segment calculated based on the Indonesian Road Capacity Manual (MKJI) 1997, which is reduced from 1 , 26 to 0.62 after the planned flyover. The Earned Value Analysis method in evaluating time performance and cost performance uses indicators, namely, ACWP (actual cost of work performed), BCWP (budgeted cost of work performed), and BCWS (bugeted cost of work scheduled). ). ACWP is a real expense, from the work that has been done up to a certain time period From the analysis results obtained value. ACWP (actual cost of work performed) 68.47%, BCWP (budgeted cost of work performed) 68.47%, BCWS (budgeted cost of work scheduled) 66.82%, Cost variance (CV) 5.11%, Schedule variance (SV) 1.66%, ETC (estimate to complate) 22.27%, EAC (estimate at complete) 85.64%. TE (time estimate), so the time needed to complete the project is 340 calendar days

Item Type: Thesis (Masters)
Uncontrolled Keywords: Earned Value Analysis (EVA), delay, cost
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 25 Mar 2021 01:06
Last Modified: 30 Oct 2023 03:58
URI: http://repository.untag-sby.ac.id/id/eprint/8687

Actions (login required)

View Item View Item