Analisis Biaya dan Waktu Pada Pembangunan Gedung Administrtasi 3 Lantai UNTL Dili, Timor Leste Dengan Metode Earned Value

Reis, Fernao Soares (2020) Analisis Biaya dan Waktu Pada Pembangunan Gedung Administrtasi 3 Lantai UNTL Dili, Timor Leste Dengan Metode Earned Value. Masters thesis, Untag 1945 Surabaya.

[img] Text
Abstrak.pdf

Download (334kB)
[img] Text
Bab 1.pdf

Download (91kB)
[img] Text
Bab 2.pdf

Download (445kB)
[img] Text
Bab 3.pdf
Restricted to Repository staff only

Download (199kB)
[img] Text
Bab 4.pdf

Download (643kB)
[img] Text
Daftar Pustaka.pdf

Download (160kB)

Abstract

Planning, cost and time control are part of the overall construction project management. As well as an assessment of quality, the presentation of a project can also be assessed in terms of cost and time. The possibility of deviations from the plan in terms of costs and time spent on construction work must be measured on an on going basis. Significant deviations in cost and time indicate poor project management deviations. As for the Time and Cost Performance Analysis with the Earned Value Analysis Method for the Construction of the 3 Floor Administration Building, UNTL Dili, Timor Leste, this method uses the Earned Value Analysis Method by collecting data in the field on the 3rd Floor Administrative Building Construction Project in Dili, Timor Leste. In this study, the Performance Analysis of Time and Cost with the Earned Value Analysis Method on the Construction of the 3 Floor Administration Building UNTL Dili,Timor Leste, obtained the results SPI of 0.16 is less than 1 indicates that the work performance is not as expected because it is unable to achieve the work target that has been planned and the CPI value is 3.94, which means that the SPI value of more than 1 indicates that the work performance is lower than the target so that 5 % late, the contractor must make sure that the target volume of work is according to plan. For the estimated cost of ETC (estimate to complate) and EAC (estimate at complete) until the completion of this project (with a delay of -5% on week 10) ETC is $ 3,142,936,431, then it can be concluded that if the project performance is the same as the project. at the time of review in week 10 with minus 5% there will be a total difference in costs of $ 3,142,936,431

Item Type: Thesis (Masters)
Uncontrolled Keywords: Cost, Schedule, Earned Value Analysis.
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 24 Mar 2021 12:42
Last Modified: 18 Jul 2022 06:40
URI: http://repository.untag-sby.ac.id/id/eprint/8672

Actions (login required)

View Item View Item