Analisis Faktor – Faktor Penyebab Keterlambatan Penyelesaian Pekerjaan Pelebaran/Peningkatan Jalan (Studi Kasus Jalan Kertosono – Kediri – Tulungagung)

Ismawanto, Izzuddin (2019) Analisis Faktor – Faktor Penyebab Keterlambatan Penyelesaian Pekerjaan Pelebaran/Peningkatan Jalan (Studi Kasus Jalan Kertosono – Kediri – Tulungagung). Masters thesis, Untag 1945 Surabaya.

[img] Text
Cover.pdf

Download (212kB)
[img] Text
Bab I.pdf

Download (89kB)
[img] Text
Bab III.pdf

Download (143kB)
[img] Text
Bab II.pdf

Download (106kB)
[img] Text
Bab IV.pdf

Download (316kB)
[img] Text
Bab V.pdf

Download (600kB)

Abstract

The purpose of this study was to find out what factors were influential and the most influential towards the causes of the delay in the work of increasing /widening the Kertosono - Kediri - Tulungagung road; and to find out the ranking of the factors causing the delay in completing the work of increasing / widening the road of Kertosono - Kediri - Tulungagung; and to find out the perceptions of respondents to the factors causing the delay in completing work. The sampling technique is divided into two types, namely probability (random sampling) and non probability (non random sampling). The object of the research and location of the research taken was the increasing / widening project of the Kertosono - Kediri - Tulungagung road. Respondents in this study were individuals who were experienced as implementers of the Kertosono - Kediri - Tulungagung road increasing / widening project work and had held roles and positions in carrying out activities referred to both supervisory consultants. The data analysis technique uses factor analysis and multiple linear regression analysis. The results can be concluded that (1) the factors that influence are work environment factors and material factors; (2) The most influential factors are work environment factors; (3) Based on the dominant factors affecting the delay in the implementation of work in succession are work environment factors and then the material factor; and Respondents' perceptions of the factors causing the late completion of work are at the most opinion that the factors causing the delay in the completion of work are caused by: Labor Factors; Design Factor; Implementation Method Factors; Material Factors; Financial Factors; Equipment Factors; Work Environment Factors; and Managerial Factors; (4) The delay in the implementation of work caused by a dominant factor caused financial losses of Rp. 208,376,058,-.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Factors of project delay, ranking, project management
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Users 26 not found.
Date Deposited: 21 Dec 2020 21:31
Last Modified: 19 Feb 2022 14:22
URI: http://repository.untag-sby.ac.id/id/eprint/6865

Actions (login required)

View Item View Item