Al Irsyad, Muhammad Alvan Mashuri (2026) Analisis Risiko Keterlambatan pada Proyek Konstruksi Perumahan Citraland Surabaya dengan Metode House of Risk (Studi Kasus: Cluster Stonegate Park, Citraland Surabaya). (Delay Risk Analysis in the Citraland Surabaya Housing Construction Project Using the House of Risk Method (Case Study: Stonegate Park Cluster, Citraland Surabaya)). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text (ABSTRAK)
Lampian 1 _1432200108.pdf Download (3MB) | Preview |
|
|
Text (BAB 1)
Bab 1_1432200108.pdf Restricted to Repository staff only Download (177kB) | Request a copy |
||
|
Text (BAB 2)
Bab 2_1432200108.pdf Restricted to Repository staff only Download (569kB) | Request a copy |
||
|
Text (BAB 3)
Bab 3_1432200108.pdf Restricted to Repository staff only Download (447kB) | Request a copy |
||
|
Text (BAB 4)
Bab 4_1432200108.pdf Restricted to Repository staff only Download (696kB) | Request a copy |
||
|
Text (BAB 5)
Bab 5_1432200108.pdf Restricted to Repository staff only Download (222kB) | Request a copy |
||
|
Text (LAMPIRAN)
Lampian 1 _1432200108.pdf Download (3MB) | Preview |
|
|
Text (LoA)
LOA JUTIN_1432200108.pdf Download (85kB) | Preview |
|
|
Text (Jurnal Publish)
JURNAL TERPUBLISH_1432200108.pdf Restricted to Repository staff only Download (310kB) | Request a copy |
||
|
Text (Turnitin Tugas Akhir)
TURNITIN TA_1432200108.pdf Restricted to Repository staff only Download (21MB) | Request a copy |
||
|
Text (Turnitin Jurnal)
TURNITIN JURNAL_1432200108.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
Construction project delays are a significant issue that can hinder the achievement of time, cost, and productivity targets. This study aims to identify the risk events and risk agents causing delays in the Stonegate Park Citraland Surabaya housing cluster project and to prioritize these risk agents using the House of Risk (HOR) Phase 1 method. Data were collected through observation, interviews, and questionnaires distributed to project stakeholders. The research instruments underwent validity and reliability testing using IBM SPSS prior to analysis via the HOR method. The results reveal eight risk events and nine risk agents influencing project delays. Based on Aggregate Risk Potential (ARP) values, the priority risk agents include ineffective communication among workers, a lack of workforce understanding regarding correct work procedures, poor workforce discipline, and workforce skills and capabilities that do not align with the job requirements. These findings are expected to serve as a guide for contractors in mitigating project delay risks and as a reference for future research in the field of construction risk management.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | House of Risk, project delay, risk event, risk agent, Aggregate RiskPotential. |
| Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction T Technology > TS Manufactures |
| Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
| Depositing User: | 1432200108 M. ALVAN MASHURI AL IRSYAD |
| Date Deposited: | 27 Aug 2026 01:49 |
| Last Modified: | 03 Sep 2026 02:09 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/47494 |
Actions (login required)
![]() |
View Item |