Mawarni, Cut Aisyah Lisa (2026) Relayout Ruang Produksi untuk Meminimalkan Jarak, Waktu, dan Ongkos Material Handling di PT Tjakrindo Mas. (Relayout of Production Area to Minimize Material Handling Distance, Time, and Cost at PT Tjakrindo Mas). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text
ABSTRAKK.pdf Download (1MB) | Preview |
|
|
Text
BAB 1.pdf Restricted to Repository staff only Download (466kB) | Request a copy |
||
|
Text
BAB 2.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text
BAB 3.pdf Restricted to Repository staff only Download (373kB) | Request a copy |
||
|
Text
BAB 4.pdf Restricted to Repository staff only Download (8MB) | Request a copy |
||
|
Text
BAB 5.pdf Restricted to Repository staff only Download (145kB) | Request a copy |
||
|
Text
DAFTAR PUSTAKA.pdf Restricted to Repository staff only Download (180kB) | Request a copy |
||
|
Text
LAMPIRAN.pdf Download (1MB) | Preview |
|
|
Text
LoA.pdf Download (85kB) | Preview |
|
|
Text
JURNAL.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
||
|
Text
JURNAL TURNITIN.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
An inefficient facility layout can disrupt material flow, increase transfer time, and raise material handling costs. This study aims to redesign the production facility layout in the chair division of PT Tjakrindo Mas using the Systematic Layout Planning (SLP) method. The analysis was conducted through the preparation of a From-To Chart (FTC), Priority Scale Table, Activity Relationship Chart (ARC), and Activity Relationship Diagram (ARD), followed by validation using FlexSim simulation. The proposed layout reduced material handling distance from 1,042.51 m to 760.64 m, representing an efficiency improvement of 27.03%. Material transfer time decreased from 2,578.38 s to 1,901.60 s, equivalent to a reduction of 26.24%. In addition, material handling costs decreased from IDR 2,767,220.62 to IDR 2,141,482.78, resulting in a cost saving of 22.61%. These results indicate that the proposed layout improves material flow efficiency and supports smoother production activities.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Uncontrolled Keywords: | Facility Layout, Systematic Layout Planning, Material Handling, FlexSim Simulation |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor N Fine Arts > NC Drawing Design Illustration Q Science > QA Mathematics > QA76 Computer software T Technology > TA Engineering (General). Civil engineering (General) T Technology > TJ Mechanical engineering and machinery T Technology > TS Manufactures |
| Divisions: | Fakultas Teknik > Program Studi Teknik Industri |
| Depositing User: | 1412200119 Cut Aisyah Lisa Mawarni |
| Date Deposited: | 26 Aug 2026 05:39 |
| Last Modified: | 01 Oct 2026 03:15 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/46527 |
Actions (login required)
![]() |
View Item |
