Relayout Ruang Produksi untuk Meminimalkan Jarak, Waktu, dan Ongkos Material Handling di PT Tjakrindo Mas. (Relayout of Production Area to Minimize Material Handling Distance, Time, and Cost at PT Tjakrindo Mas).

Mawarni, Cut Aisyah Lisa (2026) Relayout Ruang Produksi untuk Meminimalkan Jarak, Waktu, dan Ongkos Material Handling di PT Tjakrindo Mas. (Relayout of Production Area to Minimize Material Handling Distance, Time, and Cost at PT Tjakrindo Mas). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

[img]
Preview
Text
ABSTRAKK.pdf

Download (1MB) | Preview
[img] Text
BAB 1.pdf
Restricted to Repository staff only

Download (466kB) | Request a copy
[img] Text
BAB 2.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Repository staff only

Download (373kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (8MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Repository staff only

Download (145kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (180kB) | Request a copy
[img]
Preview
Text
LAMPIRAN.pdf

Download (1MB) | Preview
[img]
Preview
Text
LoA.pdf

Download (85kB) | Preview
[img] Text
JURNAL.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
JURNAL TURNITIN.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

An inefficient facility layout can disrupt material flow, increase transfer time, and raise material handling costs. This study aims to redesign the production facility layout in the chair division of PT Tjakrindo Mas using the Systematic Layout Planning (SLP) method. The analysis was conducted through the preparation of a From-To Chart (FTC), Priority Scale Table, Activity Relationship Chart (ARC), and Activity Relationship Diagram (ARD), followed by validation using FlexSim simulation. The proposed layout reduced material handling distance from 1,042.51 m to 760.64 m, representing an efficiency improvement of 27.03%. Material transfer time decreased from 2,578.38 s to 1,901.60 s, equivalent to a reduction of 26.24%. In addition, material handling costs decreased from IDR 2,767,220.62 to IDR 2,141,482.78, resulting in a cost saving of 22.61%. These results indicate that the proposed layout improves material flow efficiency and supports smoother production activities.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Facility Layout, Systematic Layout Planning, Material Handling, FlexSim Simulation
Subjects: H Social Sciences > HD Industries. Land use. Labor
N Fine Arts > NC Drawing Design Illustration
Q Science > QA Mathematics > QA76 Computer software
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri
Depositing User: 1412200119 Cut Aisyah Lisa Mawarni
Date Deposited: 26 Aug 2026 05:39
Last Modified: 01 Oct 2026 03:15
URI: http://repository.untag-sby.ac.id/id/eprint/46527

Actions (login required)

View Item View Item