Comparison Volume Analysis Between Conventional Methods And Revit 3d Applications on Box Culvert Work in Package 4 Project Kec. Rembiga – Kec. Winner

Kasuma, Refrido S. (2022) Comparison Volume Analysis Between Conventional Methods And Revit 3d Applications on Box Culvert Work in Package 4 Project Kec. Rembiga – Kec. Winner. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text (ABSTRAK)
ABSTRAK.pdf

Download (6MB)
[img] Text (BAB I)
BAB I.pdf
Restricted to Repository staff only

Download (64kB) | Request a copy
[img] Text (BAB II)
BAB II.pdf
Restricted to Repository staff only

Download (682kB) | Request a copy
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only

Download (648kB) | Request a copy
[img] Text (BAB VI)
BAB IV.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] Text (BAB V)
BAB V.pdf
Restricted to Repository staff only

Download (167kB) | Request a copy
[img] Text (LAMPIRAN)
LAMPIRAN.pdf

Download (1MB)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_small)
small.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
Official URL: http://repository.untag-sby.ac.id/

Abstract

In this era of calculating the volume of project materials using conventional or manual methods by measuring 2D images and calculating using Ms Excel, errors often occur due to inaccuracy in translating 2D images in volume calculations, Revit 2022 Software from Autodesk by applying the concept of the Building Information Modeling method (BIM) performs the volume calculation process with the schedule feature. Output is to get the final volume of material and the price of Box culvert work. Building Information Modeling method with construction volume and cost model, which contains information on material volume. The software for implementing this method is software revit 2022. In each work, it shows a certain difference, a difference of 0.05 m3, vertical A - A reinforcement 4.64 Kg, Horizontal B - B reinforcement 15.81 Kg, and C - C reinforcement for support / leg 6.05 Kg for Reinforced work Concrete Pipe shows 0.02 m3 of concrete, A - A reinforcement is 12.32 Kg, and B – B reinforcement is circular at 7.62 Kg. for the price has a difference due to the total volume changes. The results of the calculation of costs for each material include Precast Concrete Rp. 63,000.- Vertical A - A Reinforcement Rp. 57.079.-, Horizontal B – B Reinforcement Rp. 192,989.-, Reinforcement C - C Support / Legs Rp. 74.424.- Reinforced Concrete Pipe (RCP) Precast Concrete Rp. 25.200.-, Reinforcement A - A Rp. 151.555.-, and Reinforcement B - B circle Rp. 93.015.- so the difference in the price of 1 Box culvert is Rp. 55.356.- and Reinforced Concrete Pipe Rp. 67,443.-. Keyword : Building Information Modelling (BIM), Volume

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Building Information Modelling (BIM), Volume
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: 1431800044 Refrido S. Kasuma
Date Deposited: 27 Jul 2022 03:37
Last Modified: 27 Jul 2022 03:37
URI: http://repository.untag-sby.ac.id/id/eprint/16126

Actions (login required)

View Item View Item