Analysis Transformers Loading At Pt. Varia Usaha Beton Plan Lingkar Timur Sidoarjo.

Khadavi, Mu'amar (2021) Analysis Transformers Loading At Pt. Varia Usaha Beton Plan Lingkar Timur Sidoarjo. Undergraduate thesis, Universitas !7 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (918kB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (112kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (908kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (369kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (650kB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (372kB)
[img] Text
LAMPIRAN.pdf

Download (228kB)
[img] Text
JURNAL.pdf

Download (502kB)
[img] Text
JURNAL TURNITIN.pdf

Download (1MB)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (0B)
[img] Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt

Download (0B)
[img] Text
Rev_Abstrak.pdf
Restricted to Repository staff only

Download (0B)
[img] Text
Daftar Pustaka.pdf
Restricted to Repository staff only

Download (0B)

Abstract

On loading the transformer, it is stated that the standard loading value is 80%. it is expected that a transformer loading can be stable and does not exceed the specified standard limits and the load on each phase. If there is an imbalance in the load on one of the phases, the output value should not exceed 2%. As a result of this unbalanced current can trigger the emergence of a Neutral current. If there is an imbalance this load can cause losses. The author conducted an analysis held at PT. This Sidoarjo East Ring Concrete Plan Business Variation has been found at a peak load of 33% (below the SPLN standard) and the load imbalance value appears at 4.9% (exceeding the SPLN standard) continues with losses found 0.001% and almost no derrating at Transformer.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Loading, Load imbalance, Losses, Derrating Transformers
Divisions: Fakultas Teknik > Program Studi Teknik Elektro
Depositing User: 1451700011 Mu'amar Khadavi
Date Deposited: 03 Apr 2024 04:08
Last Modified: 03 Apr 2024 04:08
URI: http://repository.untag-sby.ac.id/id/eprint/10250

Actions (login required)

View Item View Item