Items where Author is "Wahyudi, Nanang Tri"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Wahyudi, Nanang Tri (2017) Penjadwalan Ulang Terhadap Waktu Untuk Optimasi Biaya Proyek Rehabilitasi Fasilitas Sandar Kapal Patroli (Studi Kasus Pada Kantor Kesyahbandaran Utama Tanjung Perak Surabaya). Masters thesis, Untag 1945 Surabaya.

This list was generated on Sat Sep 21 07:57:16 2024 WIB.