![]() | Up a level |
Raimundo, Joao (2025) Analisis Pengaruh Nilai Kontrak, Durasi Proyek, dan Jumlah Lantai Terhadap Biaya Sumber Daya Manusia Pada Proyek Konstruksi Gedung (Studi Kasus: Pembangunan Kantor ADN di Dili, Timor Leste). (Analysis of The Influence of Contract Value, Project Duration, and Number of Floors on Human Resource Costs in Building Construction Projects (Case Study: Construction of An ADN Office in Dili, Timor Leste)). Masters thesis, Universitas 17 Agustus 1945 Surabaya.