![]() | Up a level |
Huda, Moh Samsul (2019) Analisis Percepatan Proyek Menggunakan Metode PDM dengan Shift Kerja dan Penambahan Jam Lembur (Studi Kasus : Proyek HE-CCCW di PT. PAL Indonesia (Persero). (Project Acceleration Analysis Using the PDM Method with Work Shifts and Additional Overtime Hours (Case Study: HE-CCCW Project at PT. PAL Indonesia (Persero)). Undergraduate thesis, Untag 1945 Surabaya.