![]() | Up a level |
Duwit, Ortison John Welber (2024) Analisis Biaya Dan Waktu Dengan Metode Time Cost Trade Off (TCTO) Pada Proyek Pembangunan Hotel Austinov Surabaya. (Time Analysis Using the Time Cost Trade Off (TCTO) Method on the Austinov Surabaya Hotel Construction Project). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.