Evaluasi Waktu dengan Menggunakan Metode Crashing pada Proyek Pembangunan Gedung SMP 52 Surabaya.

Misrawi, Misrawi (2021) Evaluasi Waktu dengan Menggunakan Metode Crashing pada Proyek Pembangunan Gedung SMP 52 Surabaya. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (2MB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (120kB) | Request a copy
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (515kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (188kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (803kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (66kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (102kB) | Request a copy
[img] Text
LAMPIRAN.pdf

Download (4MB)
[img] Text
JURNAL.pdf

Download (596kB)
[img] Text
JURNAL TURNITIN.pdf

Download (2MB)

Abstract

In the implementation of a project, cost control and time/schedule are crucial, so that the implementation must be done properly. If the schedule is not controlled properly, it will caused bigger costs than the initial plan and the required workforce are not used optimally. The purpose of this study was to overcome lateness in the construction project of the 52 Surabaya Junior High School building by accelerating time on the critical path of the workers. This research uses the Critical Path Method (CPM). This method is able to identify a critical path in a set of activities that have determined by dependence between the activities that described or visualized in the Diagram Network to know a critical path by using the help of Microsoft project 2016. In this study, the data collection was obtained directly from the supervisor of the building construction project. The data needed are an s curve, a budget plan, and work items Data collection aims to make time acceleration analysis using the Crashing by doing the CPM sequence to knowing the critical trajectory of the work. Crashing done with adding work hours. Time acceleration was carried out at critical path with relatively long duration in code work (5, 18, 363, 378, and code 764). Thus, the normal duration 146 days of the project has been reduced to 137 days after acceleration (crashing) work time, with project duration 6.164% or 9 days of the normal duration of the project.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Crashing, percepatan waktu, CPM
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: 1431700122 Misrawi
Date Deposited: 28 Mar 2024 03:25
Last Modified: 28 Mar 2024 03:25
URI: http://repository.untag-sby.ac.id/id/eprint/9545

Actions (login required)

View Item View Item