Analis Penyebab Kerusakan Ruas Jalan Halilaran - Laularan Timor Leste Dan System Perbaikan Yang Efektif Dan Efesien (STUDI KASUS RUAS JALAN DILI_AINARO, LOT-1: HALILARANLAULARA SECTION STA. Km 2+000 – Km 12+000)

Carvalho, Pinheiro Vital De (2021) Analis Penyebab Kerusakan Ruas Jalan Halilaran - Laularan Timor Leste Dan System Perbaikan Yang Efektif Dan Efesien (STUDI KASUS RUAS JALAN DILI_AINARO, LOT-1: HALILARANLAULARA SECTION STA. Km 2+000 – Km 12+000). Masters thesis, Untag 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (231kB)
[img] Text (BAB I)
Bab 1.pdf
Restricted to Repository staff only

Download (145kB)
[img] Text (BAB II)
Bab 2.pdf
Restricted to Repository staff only

Download (181kB)
[img] Text (BAB III)
Bab 3.pdf
Restricted to Repository staff only

Download (341kB)
[img] Text (BAB IV)
Bab 4.pdf
Restricted to Repository staff only

Download (312kB)
[img] Text (BAB V)
Bab 5.pdf

Download (3MB)

Abstract

Roads are land transportation infrastructure which is very important in facilitating economic relations and other social activities. However, if there is road damage, it will result not only obstruction of other economic and social activities but also accidents for road users. This research aims to see, the road damage factors, as well as solutions to overcome the road damage that occurred in the Halilaran-Laulara road section. The method used is field research with primary data in the form of road damage survey results on Jalan Dili-Ainaro Section Lot1 Halirilaran-Laulara (Sta. Km2 + 000 - km12 + 000). The results of the survey on the type of road damage on the Dili-Ainaro road section of the Lot1 Halirilaran-Laulara Section (Sta. Km2 + 000 - km12 + 000) are collapsed, repeat lengthwise, side cracks, winding, bumpy. Damage damage factors in general are an increase in traffic volume load, the value of CBR Sub Base Course and CBE Base COurs that are not okay, bad drainage system, poor properties of pavement construction materials, climate, unstable soil conditions, planning a very thin layer of pavement, the process of carrying out work that is not in accordance with specifications. Corrective actions that can be taken are routine and periodic corrective actions and maintenance.

Item Type: Thesis (Masters)
Uncontrolled Keywords: causative factors; Causing Factors, Road Damage
Subjects: T Technology > TE Highway engineering. Roads and pavements
Depositing User: Users 26 not found.
Date Deposited: 26 Mar 2021 00:41
Last Modified: 26 Mar 2021 01:40
URI: http://repository.untag-sby.ac.id/id/eprint/8712

Actions (login required)

View Item View Item