Analisis Efektifitas Pelaksanaan Struktur Jembatan Beton Bertulang Serta Efisiensi Biaya Proyek Pada Pembangunan Jembatan Behedan, Timor Leste

Freitas, Joao Baptista de A. da S. (2021) Analisis Efektifitas Pelaksanaan Struktur Jembatan Beton Bertulang Serta Efisiensi Biaya Proyek Pada Pembangunan Jembatan Behedan, Timor Leste. Masters thesis, Untag 1945 Surabaya.

[img] Text
Abstrak.pdf

Download (173kB)
[img] Text
Bab 1.pdf

Download (94kB)
[img] Text
Bab 2.pdf

Download (178kB)
[img] Text
Bab 3.pdf

Download (141kB)
[img] Text
Bab 4.pdf
Restricted to Repository staff only

Download (254kB)
[img] Text
Bab 5.pdf

Download (86kB)

Abstract

The booming type reinforced concrete bridge is one of the infrastructure constructions that are now widely used in the State of Timor Leste as a support for the movement of transportation from one area to another because the Timor Leste region is a mountainous area so that it can provide obstacles on a road that is separated by a river so that it can obstruct the movement of transportation from one area to another. community activities in the country concerned. In the construction of a reinforced concrete bridge, the effectiveness of work implementation and cost efficiency must be considered in order to achieve the maximum level of quality and quantity in ensuring the level of strength and feasibility of its use in the future. In this study, it is argued that the effectiveness and efficiency of the Behedan reinforced concrete bridge construction project is influenced by several factors, namely the lack of provision of heavy equipment that can support the implementation of the bridge project, the lack of manpower in iron and casting work, project scheduling that does not match the duration of the planning time. , late payment process, limitations in supplying materials according to the specifications in the drawings and social problems in the Behedan area, especially in the investment sector. A good solution for the implementation of bridge construction in the future is that it requires careful design planning and the availability of adequate resources so as not to hamper the implementation of reinforced concrete bridge projects in the future.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Effectiveness, Efficiency, Resources, Investation
Subjects: T Technology > TG Bridge engineering
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 26 Mar 2021 00:10
Last Modified: 18 Jul 2022 02:18
URI: http://repository.untag-sby.ac.id/id/eprint/8705

Actions (login required)

View Item View Item