Analisis Faktor-Faktor Risiko Yang Mempengaruhi Pembangunan Jalan Karang Panasan - Blateran di Kabupaten Bangkalan

Hermanto, Nanang (2020) Analisis Faktor-Faktor Risiko Yang Mempengaruhi Pembangunan Jalan Karang Panasan - Blateran di Kabupaten Bangkalan. Masters thesis, Untag Surabaya.

[img] Text
Abstrak.pdf

Download (165kB)
[img] Text
Bab 1.pdf

Download (148kB)
[img] Text
Bab 3.pdf

Download (239kB)
[img] Text
Bab 4.pdf
Restricted to Repository staff only

Download (263kB)
[img] Text
Bab 5.pdf

Download (514kB)

Abstract

In the construction of a construction project there is the possibility of various kinds of risks that can hinder the completion of good work which affects the cost, quality and time that will occur, as is the case with the development of the Karang Panasan - Blateran road. the risk factors to be faced, the purpose of this study is to know the risk factors in the implementation of the project, to know the risk factors that affect the cost, quality and time in road project implementation. This study uses interviews and distributing questionnaires to the project owner, namely the District Public Works and Spatial Planning Office and the contractor. After the feasibility test of the questionnaire is carried out, the results of the questionnaire answers are used for risk measurement. Risk measurement is carried out using the Propability Impact Matrix (PIM) method to determine the relative importance of a risk and obtain information to further determine the appropriate risk management tool to handle it. The results of this study after analyzing the risk factors in road project implementation, there are 9 high risk factors, namely: flooding, material theft, scarcity of material production, limited material storage locations, late material / equipment, inadequate work area. , materials of less quality, unstable soil conditions, difficult access to materials and equipment to the project site. There are 3 (three) high risks that need to be handled, namely: Flood is a factor that cannot be predicted so that it becomes a joint risk between the owner and provider, the location of material storage is limited, the handling is limited,namely approaching the surrounding population to ask permission for the location of the land to be placed in the material and providing compensation to residents whose land is occupied by materials, difficulty in accessing materials and equipment to the project location, the handling of which is by using transportation suitable for field conditions

Item Type: Thesis (Masters)
Uncontrolled Keywords: risk factor analysis, risk management, road projects
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 24 Mar 2021 22:26
Last Modified: 18 Jul 2022 05:48
URI: http://repository.untag-sby.ac.id/id/eprint/8677

Actions (login required)

View Item View Item