Analisis Mitigasi Risiko Yang Berpengaruh Pada Proyek Jalan (Studi Kasus : Pekerjaan Konstruksi Paket MYC Pembangunan Jalan Lingkar Timur Waduk Jatigede)

Vignata, Aditya Viko (2020) Analisis Mitigasi Risiko Yang Berpengaruh Pada Proyek Jalan (Studi Kasus : Pekerjaan Konstruksi Paket MYC Pembangunan Jalan Lingkar Timur Waduk Jatigede). Masters thesis, Untag 1945 Surabaya.

[img] Text
Abstrak.pdf

Download (239kB)
[img] Text
Bab I.pdf

Download (146kB)
[img] Text
Bab III.pdf

Download (390kB)
[img] Text
Bab IV.pdf
Restricted to Repository staff only

Download (525kB)
[img] Text
Bab V.pdf

Download (182kB)

Abstract

Risk control planning is a process of developing options and determining the most effective actions so that it is expected to increase opportunities and reduce the risks viewed from the negative side, namely challenges. Good project management is needed to suppress any potential that can increase costs and extend the implementation time of work. Sumedang is a regency in West Java that is located in two areas of the National Activity Center (PKN), Metropolitan Bandung and Cirebon. This condition makes Sumedang very strategic because it becomes a link between two important areas in West Java. Pem BuildingEast Ring Road Jatigede Reservoir is intended to provide support on Sub National Road to improve services in the field of land transportation infrastructure.. The data that will be collected and used in this study consists of 2 kinds of primary and secondary data. From the results of the analysis can be categorized the risk of delays in work in the implementation of Construction Work Myc Package Construction East Ring Road Jatigede Reservoir, namely: Rainfall Intensity, Late land acquisition, Desan Changes, Design Errors made by Planners, Difficulty of access to project sites, Late Approval Shopdrawing, Incorrect planning / incomplete, Productivity Equipment, Difficulty obtaining work permits, and Environmental Security. Obtained the total value of risk interest rate of 2,225, while the total value of risk interest level over 54 risk factors is 7,038.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Risk Breakdown Structure , Ring Road Development
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 24 Mar 2021 02:54
Last Modified: 18 Jul 2022 07:17
URI: http://repository.untag-sby.ac.id/id/eprint/8659

Actions (login required)

View Item View Item