Penentuan Prioritas Pemeliharaan Jalan Di Wilayah UPT. Pengelolaan Jalan dan Jembatan Bojonegoro Dengan Analytical Hierarchy Process Berdasarkan Ketersediaan Alokasi Dana (Studi Kasus Penanganan Jalan Provinsi Di Kabupaten Tuban)

., Moeharto (2020) Penentuan Prioritas Pemeliharaan Jalan Di Wilayah UPT. Pengelolaan Jalan dan Jembatan Bojonegoro Dengan Analytical Hierarchy Process Berdasarkan Ketersediaan Alokasi Dana (Studi Kasus Penanganan Jalan Provinsi Di Kabupaten Tuban). Masters thesis, Untag 1945 Surabaya.

[img] Text
Cover.pdf

Download (679kB)
[img] Text
Bab I.pdf

Download (314kB)
[img] Text
Bab II.pdf

Download (954kB)
[img] Text
Bab III.pdf

Download (779kB)
[img] Text
Bab IV.pdf

Download (1MB)
[img] Text
Bab V.pdf

Download (296kB)
[img] Text
daftar pustaka dan lampiran.pdf

Download (398kB)

Abstract

Roads are facilities and infrastructure that are needed by the public and their existence must be felt by all levels of society, roads are very vital work because roads must be able to guarantee the movement of both people and goods smoothly, safely, quickly, cheaply and comfortably which is the goal from development in the provision of road transportation infrastructure. The availability of APBD funds is generally still minimal from the needs that have been proposed, then the condition of lack of funds in handling it is expected that at least the existing road can be maintained so that it can function as it should, this study will examine factors that need to be considered starting from recording road conditions, managing and sorting roads based on the level of damage and factors that affect the priority of road handling. In determining the priority scale Analytical Hierarchy Process (AHP) method is used by involving 3 elements from the Public Works Department of Public Works, the Department of Transportation and the Community with the result that overall the criteria for road structure and traffic conditions get high criteria weights so that handling is prioritized on the road structure . According to data on the condition of road damage owned by the Bojonegoro UPT.JP, good conditions 56,780 Km were handled by routine maintenance, moderate conditions were 20,900 Km handled by periodic maintenance, 3,900 Mild Damaged conditions were handled by improvement and Heavy Damaged Condition was 0.350 Development with a total budget of 100% Rp. 44,973,509,136,80 then made calculations for a budget of 75%, 50%, 25 with priority priorities for routine maintenance, periodic maintenance, improvement and finally reconstruction.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Priority Order of Road Damage Handling.
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Magister Teknik Sipil
Depositing User: Didik Ahmad
Date Deposited: 15 Dec 2020 18:30
Last Modified: 18 Jul 2022 04:28
URI: http://repository.untag-sby.ac.id/id/eprint/6779

Actions (login required)

View Item View Item