Asmoro, Mochamad Ranoe (2023) Analisis Biaya dan Waktu Menggunakan Earned Value Method Pembangunan Gedung Unit Program Belajar Jarak Jauh Universitas Terbuka Surabaya Tahap II (Cost and Time Analysis Using Earned Value Method for Construction of Distance Learning Program Unit Building of Surabaya Open University Phase II). Other thesis, Universitas 17 Agustus 1945 Surabaya.
|
Text
ABSTRAK.pdf Download (1MB) |
|
|
Text
BAB I.pdf Restricted to Repository staff only Download (566kB) | Request a copy |
|
|
Text
BAB II.pdf Restricted to Repository staff only Download (786kB) | Request a copy |
|
|
Text
BAB III.pdf Restricted to Repository staff only Download (894kB) | Request a copy |
|
|
Text
BAB IV.pdf Restricted to Repository staff only Download (961kB) | Request a copy |
|
|
Text
BAB V.pdf Restricted to Repository staff only Download (538kB) | Request a copy |
|
|
Text
LAMPIRAN.pdf Download (3MB) |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
|
|
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Restricted to Repository staff only Download (0B) | Request a copy |
Abstract
Project delays are often a source of disputes and demands between owners and contractors, so delays will be very expensive. The contractor will be subject to penalty fines in accordance with the contract and will also experience overhead costs while the project is still ongoing. From the owner's side, project delays will have an impact on reducing income due to delays in operating the facility. In the construction of the Surabaya Open University Distance Learning Program Unit building phase II, cost and time performance will be analyzed using the earned value method to measure project performance by comparing the actual value and costs with the costs that should be incurred. Based on the results of the Earned Value Method (EVM) analysis, the estimated costs incurred until the project is completed is IDR. 73,908,443,223.09 and the estimated time required for the project to be completed is 53 weeks.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Earned Value Method, Open University, Time, Costs |
| Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > magister teknik sipil |
| Depositing User: | MTS Magister Teknik Sipil 2025 |
| Date Deposited: | 02 Mar 2001 19:06 |
| Last Modified: | 28 Mar 2001 16:37 |
| URI: | http://repository.untag-sby.ac.id/id/eprint/37433 |
Actions (login required)
![]() |
View Item |
