Ar Rasyied, Syahrur Rahman (2024) Analisis Simpang Empat Bersinyal Metode Pedoman Kapasitas Jalan Indonesia (PKJI 2014) di Persimpangan Gedangan Kabupaten Sidoarjo. (Analysis Of Four Singnaled Intersections Method Indonesian Road Capacity Guidelines (PKJI 2014) At The Inttersection Of Gedangan District Sidoarjo). Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.
![]() |
Text
ABSTRAK.pdf Download (4MB) |
![]() |
Text
BAB I.pdf Restricted to Repository staff only Download (143kB) | Request a copy |
![]() |
Text
BAB II.pdf Restricted to Repository staff only Download (667kB) | Request a copy |
![]() |
Text
BAB III.pdf Restricted to Repository staff only Download (633kB) | Request a copy |
![]() |
Text
BAB IV.pdf Restricted to Repository staff only Download (460kB) | Request a copy |
![]() |
Text
BAB V.pdf Restricted to Repository staff only Download (198kB) | Request a copy |
![]() |
Text
LAMPIRAN.pdf Download (550kB) |
![]() |
Text
JURNAL.pdf Download (317kB) |
![]() |
Text
JURNAL TURNITIN.pdf Download (1MB) |
![]() |
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Text
Tugas Akhir (Turnitin).pdf Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_small)
small.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_preview)
preview.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_medium)
medium.jpg Download (0B) |
![]() |
Other (Thumbnails conversion from text to thumbnail_lightbox)
lightbox.jpg Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
![]() |
Other (Generate index codes conversion from text to indexcodes)
indexcodes.txt Download (0B) |
Abstract
Almost all the time there is an increase in vehicle volume, especially during peak hours such as leaving or returning from work. The existence of several problems that arise at road intersections makes the author interested in conducting research and analysis based on theory and direct observation. In this case what is discussed is the traffic situation that occurs at the Gedangan Intersection, Sidoarjo Regency (North: JI. Surabaya-Malang), (South: JI. Ahmad Yani), (West: JI. Raya Sukodono), (East: Jl. Raya Jenggolo). The method used in this research is the Indonesian Road Capacity Guidelines (PKJI 2014). Based on the data obtained, traffic flow (Q), capacity (C), degree of saturation (DJ, queue length (PA), delays (T), as well as behavioral factors that influence intersection traffic conditions can be calculated. can be maintained. From data analysis, road service level results were obtained: Jalan Surabaya - Malang with DJ = 0.93, Jalan Ahmad Yani with DJ = 0.93, Jalan Raya Jenggolo with DJ = 0.93 and Jalan Raya Sukodono with DJ = 0.93. The average delay figure = 718.3 sec/hour. It can be concluded that the performance of the Gedangan intersection, Sidoarjo Regency is at service level F.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Signalized intersection; Traffic Performance; PKJI 2014 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | 1431900065 Syahrur Rahman Ar Rasyied |
Date Deposited: | 19 Apr 2024 02:44 |
Last Modified: | 24 Apr 2024 03:41 |
URI: | http://repository.untag-sby.ac.id/id/eprint/28988 |
Actions (login required)
![]() |
View Item |