Rescedulling Proyek Kontruksi Pembangunan Saluran Diversi Gunungsari Banjar Sugihan-Sememi dengan Menggunakan Microsoft Project.

Sulistiyowati, Novita (2021) Rescedulling Proyek Kontruksi Pembangunan Saluran Diversi Gunungsari Banjar Sugihan-Sememi dengan Menggunakan Microsoft Project. Undergraduate thesis, Universitas 17 Agustus 1945 Surabaya.

[img] Text
ABSTRAK.pdf

Download (1MB)
[img] Text
BAB I.pdf
Restricted to Repository staff only

Download (162kB) | Request a copy
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (625kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (128kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (81kB) | Request a copy
[img] Text
LAMPIRAN.pdf

Download (883kB)
[img] Text
JURNAL.pdf

Download (284kB)
[img] Text
JURNAL TURNITIN.pdf

Download (1MB)

Abstract

In the implementation of a project sometimes it does not go well, because there are obstacles that hinder the existing work. One of the obstacles that are often encountered in the field in the Gunungsari Banjar Sugihan-Sememi diversion channel development project is erratic weather conditions, this is because in the initial planning the planners did not consider the season/weather conditions that would occur during the implementation of this project. . The impact that arises due to this delay is an increase in the duration and budget for project implementation costs. So that in overcoming this, rescheduling is carried out which is expected to produce a logical and realistic schedule. Many methods are used in scheduling, where these methods are expected to facilitate scheduling planning. The purpose of this study is to calculate the results of the duration and calculate the total cost required in implementing the project after rescheduling. This type of research is analytic. Data collection in the form of secondary data such as schedules and RAB is carried out by directly requesting the required data from the relevant parties, then an initial schedule evaluation is carried out, followed by the preparation of a new schedule using Microsoft Project tool using the Critical Path Method. The results of this study showed that the rescheduling duration was 587 days, 107 days longer than the initial plan duration of 480 days, and a fee of Rp. 12,753,676,644 of the initial plan cost of Rp. 91.447.665.334,30

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Rescheduling, RAB, Microsoft Project
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: 1431600028 Sulistiyowati Novita
Date Deposited: 03 Apr 2024 05:35
Last Modified: 03 Apr 2024 05:35
URI: http://repository.untag-sby.ac.id/id/eprint/10140